How much should we order at a time?
EOQ is the order size that minimises ordering cost plus holding cost. Order too little and you pay to reorder constantly; order too much and cash sits on the shelf. The tool also shows the cash an average order ties up.
Your assumptions
Worked-example values — replace with yoursExcludes safety stock — see the safety stock and reorder point tool.
This is an estimate. Check it on your own data.
EOQ assumes steady demand and known costs. The replenishment policy that holds up under real demand — by item class, with supplier minimums — is built on your own history in a workspace.
Your inputs travel with you into the request, or into the free Margin Scan. Nothing is sent to ADEXMA until you submit a form.
The formula
- EOQ = √( 2 × annual demand × cost per order ÷ holding cost per unit per year )
- orders per year = annual demand ÷ EOQ
- cycle stock = EOQ ÷ 2 · cash tied up = cycle stock × unit cost
Worked example · the values pre-filled above
Annual demand: 10,000 units · Cost to place and receive one order: $50 per order · Holding cost of one unit: $2 per unit · Cost of one unit: $10 per unit
- EOQ = √(2 × 10,000 × $50 ÷ $2) = √500,000 = 707 units.
- Orders per year = 10,000 ÷ 707 = 14.1.
- Average cycle stock = 707 ÷ 2 = 354 units, which at $10 a unit ties up $3,536.
Result: 707 units · 14 orders a year
What this assumes
- Demand is steady and known; real demand is lumpy, so treat the answer as a starting point.
- No quantity discounts, minimum order quantities or pack sizes.
- Order and holding costs are constant.
- It is an estimate from your own inputs. Results from different tools overlap and must never be added together into one savings figure.
Sources
- Harris, F. W., “How Many Parts to Make at Once”, Factory, The Magazine of Management 10(2), 1913 — Origin of the economic order quantity.
- Silver, E., Pyke, D. & Thomas, D., Inventory and Production Management in Supply Chains (CRC Press, 4th ed.) — EOQ and its sensitivity to cost errors.
- ADEXMA Calculation Catalog · FRM-SC-004 · part of Margin Architecture™.
Questions people ask
What is the economic order quantity?
The order size that minimises the sum of ordering cost and holding cost. It is the square root of 2 × demand × order cost ÷ holding cost.
Is EOQ sensitive to my inputs?
Only mildly: the total cost curve is flat near the optimum, so being off by 20–30% on the order size costs little. Wrong inputs matter more than rounding.